Sense → diagnose → decide → act → verify
A supervised team of nine specialist agents closes the loop on every incident — humans approve what matters, agents handle the rest at statewide scale.
The loop, on a live incidentநிகழ்வு தீர்வு
INC-4471 · Govt Higher Sec. School, Avadi
All 18 lab PCs, the smart board and the block router dropped their heartbeats within 40 seconds of each other.
Incident summary
The agent teamமுகவர் குழு
Nine specialists, each owning one job in the loop
Watches every telemetry stream; detects outages, anomalies and degradation with rules + ML.
Correlates signals against manuals and incident history to separate power, network, device and software causes.
Forecasts failures from age, usage and error patterns; schedules preventive action before breakdown.
Resolves common faults remotely via the edge hub; raises a context-rich work order when it cannot.
Routes work orders to the right AMC vendor by SLA and geography; closes only when telemetry confirms the fix.
Turns failure, end-of-life and utilization signals into GeM-aligned indents. Drafts only — never places spend.
Measures real usage vs idle; surfaces redeployment and where training, not hardware, is the gap.
Tracks last-mile uptime; flags chronic-outage schools for ISP escalation or 4G failover.
Answers questions and drafts reports in Tamil and English for officials at every tier.
Graduated autonomyதன்னாட்சி நிலைகள்
Agents earn autonomy on low-risk actions — spend and procurement always wait for a human
Pending human approvalsஒப்புதல் வரிசை
High-stakes and irreversible actions wait here for sign-off
Lamp-hours exceeded; predicted failure < 14 days; warranty expired.
Connectivity degradation trend; on-site diagnosis required.
Chronic last-mile outages exceeding 30 days.
Idle > 21 days at source; documented shortage at destination.
Live activityநேரடி
Restarted hung print service — smart board back online
GHSS Perambur
Root-caused lab outage to mains power, not hardware
GHSS Avadi
Last-mile link flapping — opened watch + ISP ticket
GHS Pollachi
Work order WO-4457 verified by telemetry — closed
GHSS Melur
Projector lamp-hours exceeded — flagged for replacement
GHSS Attur
Auto-inventoried 41 new endpoints after edge-hub sync
GHSS Kumbakonam
9 laptops idle > 21 days — redeployment recommended
GHSS Palani